Skip to content
NORR
Residential

Bishop’s Manor

Located in Calgary’s established inner-city community of Bridgeland, Bishop’s Manor provides affordable, multigenerational housing that prioritizes both affordability and livability.

Client Forward Housing Association
Size 100,287 SF (9,317 SM)
Location Calgary, AB, Canada
Date 2021
Street-level view of Bishop's Manor featuring contemporary affordable housing architecture.

Challenge

Forward Housing sought to create a development that could serve a wide range of residents, from seniors with accessibility barriers to multigenerational families. Guided by a theme of juxtaposition, Bishop’s Manor balances security with permeability, playfulness with practicality, and the needs of residents across generations, all within the constraints of an irregularly shaped site and a budget funded entirely through grants and donations.

Solution

The five-storey development provides 104 affordable housing units alongside amenity spaces designed to enhance livability, including a dedicated spiritual space, multi-purpose event space, rooftop patio, and offices for the Forward Housing organization. Working closely with the client and construction manager from project outset, the team developed a building that stretches across three street frontages to maximize the site. To accelerate delivery, the above-grade structure was prefabricated, allowing framing to be completed in just six weeks.

Outcome

Collaboration between our team and Catapulta, the construction manager, resulted in minimal change orders during construction and maximized cost savings for the client. The finished project translates into a building that achieved high energy targets and will provide adaptability to the client for years to come.

Bishop's Manor illuminated at dusk showcasing the residential façade and main entrance.
Residential corridor featuring elevators, wayfinding, and contemporary finishes.
Multi-purpose community room with flexible open space and contemporary finishes.

Funded entirely through grants and donations, the project maximized every dollar through early collaboration, prefabrication, and efficient design.

Accessible kitchen and dining area within a residential suite.

A rooftop patio, spiritual space and multipurpose room create opportunities for connection, reflection and community.

Children's play room featuring indoor play structures and colourful finishes.

Playful color accents reflect the project's theme of juxtaposition, balancing practicality with a welcoming residential character

Colourful mural artwork within a residential corridor.
Secure bicycle storage room with mural artwork and bike racks.
Resident gathering lounge featuring mailboxes, seating, and community space.
Communal kitchen and amenity space featuring island seating, pendant lighting, and gathering areas.
Corridor view into a meeting room featuring office workstations and large exterior-facing windows.

A dynamic approach to affordable housing, Forward Housing’s Bishop’s Manor provides housing that not only focuses on affordability but liveability. The challenge was to serve a variety of needs and demographics in one project, from a single senior with accessibility barriers to a multigenerational family. Affordable living options are illustrated through 104 units spread across five storeys. Several unique amenity spaces were designed, increasing the “liveability” aspect such as a dedicated spiritual space, multi-purpose event space, rooftop patio and offices for the Forward Housing organization. Located in Calgary’s vibrant and established inner-city community of Bridgeland, Bishop’s Manor will serve as a point of connection, where affordable housing is situated within close proximity to services, employment opportunities, education, recreation, and transportation. Simultaneously, the residents of the development will bring a unique energy to the community, encompassing cultural and generational diversity.

Bishop’s Manor delicately plays with the theme of juxtaposition throughout its design. Our team was challenged to design a building that was all things to all people: balancing security with permeability, playfulness with practicality, and supportive of intergenerational living from young children to seniors. As such, our team collaborated closely with the client and the construction management company from project onset to ensure appropriate building programming. Our team also provided landscape architecture services to work within the constraints of an irregularly shaped parcel of land. Due to the unique nature of the site, the building is outstretched to meet each of the three frontages. As a building funded completely via grants and donations, every dollar and minute of the schedule counted. To expedite construction, the above-grade structure was prefabricated enabling the completion of framing construction in six weeks.

True collaborative design and construction resulted in minimal change orders during construction and maximized cost savings for the client. Catapulta, the Construction Manager, and NORR were in constant communication, tweaking the design as new products and technology made their way to the market. The end result translates into a building that achieved high energy targets and will provide adaptability to the client for years to come.

Still scrolling? See what’s next.